SITE REMEDIATION AND TREATMENT TECHNOLOGIES
-
25 – 26 October 2022 | 9:00 AM – 4:30 PM
-
Department of Geological Sciences, Kotlářská 2, Brno, building no. 11, schoolroom G2Department of Geological Sciences, Kotlářská 2, Brno, building no. 11, schoolroom G2
About the Event
Lector
J. Šolc, Senior Project Manager, INTES, Inc.
Course price
- face-to-face form: 2 900,- CZK (incl. VAT) - capacity limited to 15 persons - BUY THROUGH THE MU SHOPING CENTER
- on-line form (MS Teams) : 5 900,- CZK (incl. VAT) - FOR INDIVIDUALS AND CORPORATE ONLINE ACCESS FOR MULTIPLE PARTICIPANTS- BUY TROUGH THE MU SHOPING CENTER
Small refreshments, electronic teaching materials, video recording will be provided for the participants.
The course will be held in Czech.
PROGRAMe
25.10. (9-16.30) Remediation Technologies – From Design to Operation
- Pump-and-treat revisited
- Soil vapor extraction (SVE) and bioventing
- Air sparging
- Vacuum enhanced recovery/multiphase extraction (VER/MPE)
- Engineered in-situ biodegradation/bioremediation – aerobic and anaerobic processe
- Natural attenuation principles and aquifer assimilative capacity
- Reactant/nutrient delivery
- Nutrients
- Aerobic treatment
- Anaerobic systems (Enhanced reductive dehalogenation-ERD)
- In situ chemical oxidation
- Hydrogen peroxide
- Fenton reagent
- Potassium permanganate
- Ozone
- Fe(0) anaerobic corrosion
- Reactive walls/barriers, in-situ reactive zones
- Vapor migration control
- Thermal enhancement, resistance heating, in-well stripping, etc.
- Case studies and design fundamentals
- Economics
26.10. (9-16.00) Management and Economics
- Project Life Cycle Strategy and Economics II
- Reasonable expectations
- Environmentally/Regulatory acceptable endpoints
- General costs and case studies
- Money
- Most Common Mistakes (technical x managerial)
- Project staff
- Risks with too much and too little information
- Interpretive and design mistakes (hydraulic tests, obstacles unaccounted for, too much is not always better, mass balance x site improvement, isoconcentration).
- Over-design and economics
- Drilling; well completion
- Sampling and QA/QC – what do we really need?
- Importance of a flexible approach with respect to changing site conditions-active project management.
- Reporting and documentation …a story to tell
- Necessary (and unpleasant ) tradeoffs
- Conclusions
- Preventive measures are investments well made
Additional Information
| Accessibility | Without specific accessibility measures |
|---|
Where to go to the event
Loading map…